Showing posts with label Contractors. Show all posts
Showing posts with label Contractors. Show all posts

Sunday, July 31, 2011

Scope of Work

Michael and I put together a scope of work for our contractor.  This is needed so you and your contractor can be on the same page.  It's a check list for him and you.


Scope of Work: 201 S. Hoskins Rd #131, Charlotte, NC 28208

Kitchen
·         Plumbing for sink, refrigerator and dishwasher
·         Electrical-necessary electrical for backsplash, range, microwave, refrigerator, dishwasher, disposal
·         Installation of cabinets-Pick up from Pro-Stock Kitchen Greer location
·         Build pantry next to refrigerator (counter depth) with door
·         Build ledge for cabinets in front of window
·         Install outlet behind fridge with switch for under cabinet lighting; lights installed by owner
·         Install backsplash
·         Granite installed by other
Downstairs Bathroom
·         Remove flooring and secure subfloor-install concrete backer if necessary.
·         Install floor tile-match existing seams and grout width; tile furnished by owner
·         Reuse existing toilet and shower
·         Install 31” vanity by pro-stock,  vanity top furnished by owner, fixture furnished by owner
Upstairs Bathroom
·         Frame new walls and drywall
·         Run plumbing for new shower with two fixture (separate controls), toilet, and vanity
·         Run necessary electrical for bathroom including light box centered above vanity and overhead shower light; both lights provided by owner
·         Install 34”x60” shower pan from Home Depot
·         Install tile surround in the shower to the ceiling provided  by owner
·         Install shower doors provided by owner
·         Install vanity, vanity top, sink fixtures, shower fixtures, and toilet all provided by owner
Bedrooms
·         Frame new walls and drywall.
·         Extend loft floor to 2’ from window; match existing floor upstairs and existing ceiling downstairs
·         Move chase to new wall.
·         Run new electrical outlets and supply cable outlet for each room
·         Install framing and windows provided by Chuck in upstairs room centered on existing window; Install transom window on wall facing den in upstairs room
·         Build closet on upstairs  and downstairs bathroom walls; install socket and bulb in closets with switch and sliding closet doors
·         Match floor downstairs up to and inside the closet; hallway tile remains
·         Move panel to hallway wall adjacent to closet (closet is going on wall where existing panel is located)
·         Install 4 can lights in the downstairs bedroom provided by Chuck.
·         Install Single light housing with switch upstairs; light provided by owner
General Items
·         Install all doors; stainable slab doors provided by Chuck; owner will stain
·         Install can lights in downstairs hallway; Provide 3 way switches at beginning and end
·         Install light housing in kitchen, dining, and living room; owner will provide fan for living and kitchen and light for dining.
·         Turn stairs and build landing; install metal rails provided by owner
·         Save removed railings for owner
·         Extend Laundry room under landing and expose large round post to kitchen area (if possible)
·         Install necessary electrical, plumbing, and venting for washer and dryer
·         Fix broken window
·         Bring fire risers and sprinklers to code
·         Install duct work for HVAC and ensure unit is functional; if not, replace
·         Install new water heater (40-50 gallon; contractor advise on sizing)
·         Install new baseboard trim, casing
·         Remove all accumulated trash and debris
·         Repair all existing drywall
·         Reuse as much existing conduit, wire, switches, outlets etc. as possible
·         Manage sub-contractors

Questions
·         Fan for bathroom?
·         Insulate walls?
·         Make Operable windows?
·         HVAC ductwork; using downstairs duct for floor vents upstairs (combine venting for bathroom, closet , and room up and down in one artery vent; run new ductwork in living area)
·         Owner may request installation of new front door after evaluation of current door
·         Painting done by owner; Owner requests use of tall ladder to paint walls over weekend
·         Remove wallpaper.