So, this week has been crazy busy at work for me. I have not kept up with the contractor as I normally would or should. So, today I texted him to touch base on how everything was going. And, he sent me this picture! In this picture you can see that they reused the staircase, and turned it 90 degrees. They built the landing necessary to have a laundry closet underneath. They moved the electrical panel. They have framed the downstairs bedroom. And, they have moved the necessary plumbing and other utilities for the upper floors to the far wall. The only thing left from the chase that we are moving is the cable lines. We are in contact with the cable company to move them.
We'll post more pictures soon!
No comments:
Post a Comment